The works on the construction of the solar power plants in Drenovac and Ševarica, along with the associated OMP facility, have been completed. We have implemented a local telecommunications network between these sites for the transmission of signals from the plants, and for the part of the telecommunications network intended for connecting to the monitoring and control system of the responsible ED Šabac, we have carried out supervision tasks.